• In moisture control systems, start-up is not just the switching on of a device, connecting fluids and starting the unit. The correct adjustment of air, water, electricity, control and mechanical elements is a complex task that requires multidisciplinary knowledge and experience in a variety of applications to suit all our customers.
    • Our commissioning work reduces a multitude of future problems that can be difficult to solve during the life of the building or production process. Future service costs can be reduced and the Fisair guarantee can take center stage.

  • Correct operation of the equipment from its start-up.

  • Avoiding premature deterioration of equipment.

  • Minimum energy consumption guaranteed.

  • Fewer problems with your installations or processes.

  • Correct integration with the control system of the building or process.

  • Safety issues eliminated.